Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Tank installation in Sharq involves hoisting to a tall building roof and connecting the pump to a nearby power source. We run copper pipes through columns and interior walls, fit air-release valves, isolation cocks and test cocks on each distribution line.
Sharq towers, residential and commercial, are very tall with roof tanks at great height near Kuwait Towers. We need precise pressure calculations because the roof tank must deliver sufficient pressure at the lowest occupancy. Pipes in these towers are hidden inside hollow concrete columns so we use fixed-diameter copper pipe installed before pouring or routed through existing service shafts. Pressure testing here is critical because hidden leaks can damage the structural columns.
Sharq in Kuwait governorate contains modern high-rise towers where working roof height exceeds one hundred metres and requires advanced pressure engineering.
Before tower handover, each distribution line is tested at steady pressure for thirty minutes to detect any leak in hidden pipes.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We study the structural drawing first to map existing pipe routes. We use standard-gauge copper pipes of fixed diameter threaded before concrete pour or through agreed service shafts, then pressure-test them at high PSI.
Yes, an intermediate tank can be fitted on a mid-floor or plant room to split the pressure zone. We calculate the required height and connect both tanks to one pump that fills them in sequence.
