Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Water tank installation in Dasman begins by checking the apartment building or villa roof to confirm the structure can bear the load. We size the tank to match the number of flats and consumption, then set the supports and run supply, distribution and overflow pipes with proper gradient.
Dasman residential buildings mostly have strong concrete foundations and reinforced roofs, allowing large tanks to sit directly on the structure. We test the supports under a trial load before the tank itself goes up, and check pipe falls run down from the roof tank to the underground collection tank. Properties near Arabian Gulf Street need extra protection on metal joints against moisture and corrosion.
Dasman lies in Kuwait governorate on the Gulf coast, a district of row apartment blocks where each building shares one roof tank.
Before completion, the tank is filled fully and all joints are watched for a full hour to confirm no leaks develop.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the roof dimensions, columns and concrete first, and most newer Dasman buildings have adequate foundations. If the structure is older, we may request a structural engineer's review before proceeding.
Usually two to three days, depending on tank size and distance from the main supply line. We cut water in the morning and complete connections and testing before dusk.