Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Water tank installation in Shuwaikh Industrial differs from residential work because maintenance plants and storage facilities need large tanks with high flow rates. We calculate tank volume from daily consumption curves, fit high-pressure pumps with powerful electric motors and test everything under full load.
Factories, warehouses and logistics buildings in Shuwaikh Industrial use buried underground tanks or large above-ground horizontal tanks. We dig a deep pit with an initial site visit to check soil type and groundwater level, and place the tank away from main sewage pipes. Pumps mounted on the tank need strong steel connections and distribution lines with large diameters and dedicated power supply protected from sudden cuts.
Shuwaikh Industrial sits in Kuwait governorate near the areas surrounding KISR, a heavy commercial district.
The new tank pump is run continuously for four hours and motor vibration, pressure and leaks are checked before keys are handed over.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If we dig to the correct depth and build pit walls with thick concrete and bitumen seal around the tank, it is completely safe. We test groundwater first to know salinity and acidity before choosing tank type and sealant.
One factory usually needs one strong pump or two matching pumps working in rotation. Choice depends on required water flow, daily working hours and tank size available for storing any excess.