Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Water tank installation in Kuwait City often means lifting a large tank onto the roof of a commercial building near Liberation Square or the Grand Mosque. Downtown streets are busy and access is tight, so the crane or hoist lift is planned for early morning with the building team before the tank is delivered.
A large roof tank cannot be carried up the stairs, so it is lifted over the building edge and set onto its stand in one move. We confirm beforehand that the stand is ready and level, the roof route is clear, and the pipework ends are prepared. In Kuwait City the tank is then connected to the inlet, outlet, overflow and drain, filled, and checked for leaks before the building's supply is switched to it.
Kuwait City is the capital's commercial centre, with dense buildings around the Grand Mosque, Kuwait Towers and Liberation Square.
The stand is checked level and pipe ends prepared before the lift, so the tank is set in one move.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Streets are quieter and it is cooler on the roof, which makes the lift safer and causes less disruption to traffic and tenants.
Only briefly, when the new tank is connected. The old supply stays in service until the new tank is filled and tested.
