Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Farwaniya
Water tank installation in Rai Industrial is typically large-scale because workshops and facilities need high water volumes. We choose large-capacity tanks, connect them with powerful pumps, lay thick pipes rated for pressure, regulate all flows and finish with comprehensive system testing.
Rai Industrial contains workshops, assembly units and storage facilities each consuming significant water. Buildings here are modern with strong foundations and roofs designed for heavy loads, allowing installation of massive tanks directly on roofs or in concrete yards. We fit multi-stage pumps to raise water to all workshop floors, connect pipes of different gauges to match required flow rates and install pressure gauges and safety valves at every critical point.
Rai Industrial lies in Farwaniya adjacent to The Avenues Mall, a modern industrial zone with advanced facilities and robust foundations.
In the industrial area we test pump systems at full load for many hours before handover because any failure can halt production.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We select very large capacity tanks and install multi-stage pumps with sufficient power. We fit control valves that regulate pressure and flow to match each workshop section's needs to ensure uninterrupted supply.
Yes, but it requires check valves on each pump and separate pressure regulators for each one. We recommend separate feed lines from the tank to each pump to avoid pressure drop.
