Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Farwaniya
Water tank installation in Rehab starts by lifting the tank onto the roof, then connecting the inlet from the meter and the outlet to the apartment lines. We test pressure and check for leaks before running the pump and adjust tank height to deliver steady pressure to every floor.
Rehab houses are usually three or four storeys, and roof space is tight so we choose tall narrow tanks instead of wide ones. We measure the distance from the stairwell opening to the roof edge and make sure the tank fits without breaking a wall or removing the shade structure. The outlet line runs down the stairwell corner under tiles and splits at each floor with individual valves so that maintenance on one apartment does not cut water to the rest.
Rehab is in Farwaniya governorate, a family residential district where each house needs a rooftop tank to collect water from the main network.
Before handover we fill the tank completely and open each floor valve one at a time to check that water reaches with even pressure.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the tank is sized correctly for the number of residents and daily use. We calculate the capacity first, then choose the shape that fits the available roof space without removing existing structures.
Yes but the outlet line will be longer and need roof brackets to support the pipe run. If the roof is sloped we choose a high point so we do not have to build up the tank base too much.
