Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Farwaniya
Roof tank placement in Abbasiya requires precise siting because apartment roofs are tight and the distance to the main drain is often long. We find a balance point for strength and gravity flow, mount the tank, run the pipes and perform full pressure testing.
Abbasiya is a residential district of multi-storey apartment buildings with limited roof space and shared drainage routes. Each roof has little room and may already host other raised structures or equipment. We measure available space and review the shared drainage plan to find where the main stack sits. If it is far away, we need a longer roof-level overflow pipe with intermediate supports every three metres.
Abbasiya lies east in Farwaniya and is known for dense apartment blocks where many families share a single infrastructure.
Before handover, tank pressure is tested under peak flow from all household outlets running together.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, each tank has its own isolation valve and separate overflow pipe. Filling your tank does not affect neighbours' pressure if the main stack has adequate capacity.
We use adjustable supports under the tank legs to level low corners. The overflow outlet is tilted separately towards the main stack with its own fall.
