Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Hawalli
Large villas near Bayan Co-op usually need more storage than one tank can hold, so roof tank installation in Bayan often means two or three tanks linked together. We connect them so each can be isolated and cleaned while the others keep the house supplied.
Linking tanks badly is a common source of trouble: joined by a single low pipe, the far tank becomes a dead end whose water barely changes and goes stale. For a Bayan villa we feed and draw across all tanks through a balanced manifold, set every tank base at the same level so they fill and empty together, and put a valve on each connection. One tank can then be emptied for cleaning while the household carries on using the rest without interruption.
Bayan, around Bayan Palace and Bayan Co-op in Hawalli, has large villas whose daily use calls for several linked roof tanks.
A tank joined to others by one low pipe becomes a dead end where water sits unchanged for long periods.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if each tank has its own valves on a balanced manifold. The one being cleaned is closed off while the others keep supplying the house.
It may be a dead-end tank that fills but rarely empties. Re-piping so every tank is fed and drawn in turn keeps the water moving.
