Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation in Bnaidar requires carefully hoisting the tank onto the flat roof and anchoring the base on strong load points. We run water lines from the pump and overflow to surface drainage, then pressure-test and check flow for a full hour.
Bnaidar is a simple desert zone with houses scattered over large distances and roofs usually flat exposed concrete. Ground settlement on sand may occur under a full tank's weight, so we install a thick concrete base instead of thin slab. Supply lines come from a nearby well or central pump station if available, and overflow must slope steadily toward a ground drain or side tank to protect surrounding areas from flooding.
Bnaidar is in the southeast part of Ahmadi governorate, an isolated desert area where each house relies on its own roof tank for water.
We measure base subsidence one week after first filling because Bnaidar sand causes gradual settlement that may affect overflow slope.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
First inspection three days after fill, second after two weeks, then once monthly. We check bolts, joints and base for cracks and slow leaks each time.
Yes, but mount it 1.5 metres below the tank minimum to ensure adequate gravity pressure. Install a check valve before the pump to prevent vacuum if power cuts out.