Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation at Shuaiba Industrial starts with checking roof strength and position near the main pipe exit. We choose a spot that lets water fall naturally into the lower network. We connect inlet and outlet, run a full pressure test, and hand over.
Industrial plants across Shuaiba need roof tanks to hold water at low pressure, which steadies supply to machinery. Concrete roofs on industrial buildings are strong enough for a heavy tank, but pipe runs to production equipment stretch long distances. We check each line length and fall, then set tank height so it gives the pressure needed at the furthest use point without overloading the tank.
Shuaiba Industrial sits in Ahmadi governorate, a cluster of petrochemical plants and stations that rely on steady water supply.
Before final installation, every weld and connector is tested at pressure higher than operating pressure to check for leaks under real load.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate the total height difference from roof to the furthest use point, then set tank height to give enough pressure without major loss. We test pressure at every end point before handover.
Yes, for very high demand we connect two tanks with a balance pipe so they fill together and keep pressure even. We test flow balance and total pressure after all connections.
