Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation in Shuaiba requires lifting the tank above a building that may adjoin industrial facilities. We choose a safe location away from vents and chimneys and secure the tank on an isolated base. We connect supply and overflow lines and check full pressure before final release.
Shuaiba is an industrial port south of Ahmadi, and residential buildings there sit near desalination plants and refineries. Roofs may be exposed to salty or smoky air, so we choose a tank made from corrosion-resistant material. Inlet and outlet pipes need secure covering so vapours cannot enter the tank. Overflow must finish carefully so it does not cause dampness around the base on crowded roofs.
Shuaiba is an industrial and residential area in Ahmadi governorate where heavy projects and port operations create a challenging environment for water tank installation.
Tank and joints are tested for thirty minutes at full pressure in Shuaiba conditions to ensure durability against corrosion.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, salt and humidity cause rapid rust on ordinary steel. We use fibreglass or stainless steel tanks in Shuaiba, both of which last longer in the marine environment.
We cover inlet, outlet and overflow pipes with tight plastic sleeves and fit air filters on vent openings. This keeps contaminants out of the tank.
