Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation in Fintas starts with lifting the tank to the rooftop and securing it on a level concrete base. We run supply pipes from the main line and fit drop lines down to lower flats. We install a float valve and an overflow pipe, then pressure-test every joint before final commissioning.
Fintas coastal houses are usually multi-storey with flat roofs strong enough to hold a full tank. Before fitting we check the roof for cracks or damp, because a small leak under the tank can grow quickly over time. We place the tank away from air vents and close to the main water inlet point, which shortens the feed pipe and avoids excess pressure.
Fintas is in Ahmadi governorate, a coastal residential area where most apartment buildings need reliable water storage on the roof.
The tank and pipes are tested under full pressure for twenty minutes before handover to ensure no leaks exist.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Each metre of height gives roughly one-tenth of atmospheric pressure. We measure from the tank bottom to the highest tap in the building, and nine metres usually provides reasonable pressure.
Yes, but the concrete base must be perfectly level and the roof sound with no sag. A corner near the main entry shortens the feed line and makes maintenance easier.