Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Mubarak Al-Kabeer
Roof tank installation in Masayel starts with checking ceiling strength and positioning the tank away from electrical conduits. We size the tank by floor count and daily use, run supply lines from the main riser and connect waste to the sewer main. The tank is secured on heavy metal bases and all joints are pressure-tested.
Masayel homes are older with flat concrete roofs and no overhead beams, so we mount the tank directly on the stair landing or on a weight-distributing steel base. We inspect the old roof drainage and confirm existing waste pipes do not block the tank outlet. When cold water enters from the main riser we check pressure and fit a pressure regulator if needed, because high pressure can damage the tank.
Masayel sits in Mubarak Al-Kabeer governorate, an older residential district where most homes have flat roofs ready for tank installation.
We fill the tank and hold it for one hour to check for leaks before connecting distribution lines.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We examine the roof first, measure concrete and reinforcement, and choose tank size accordingly. If the roof is weak we distribute weight on a reinforced steel base across multiple points.
We fit a float valve on the supply line that closes automatically when the tank fills. We also install a vent pipe on the roof and a cleaning outlet at the base for regular maintenance.
