Cold water supply
PPR runs to every tap, cistern and appliance point in the unit

Mubarak Al-Kabeer
Apartment pipework in Masayel addresses new residential buildings with compact designs and tight underfloor space. We plan each pipe precisely to avoid crossings and pressure-test immediately before concrete is poured.
Masayel apartments are usually in modern towers with tight underfloor spaces that leave little room for pipe runs, electrics and mechanical services. We measure the available height below the slab first and pinpoint exactly where supply and waste lines pass. Distribution boxes are mounted in the entrance or separate service ducts away from living areas, each fitted with isolation valves and air-release cocks.
Masayel lies in Mubarak Al-Kabeer governorate, an emerging residential area with modern buildings and ongoing development projects.
We use smaller-diameter plastic pipes to fit tight underfloor spaces, but test them under full pressure before any covering.
PPR runs to every tap, cistern and appliance point in the unit
uPVC drain lines graded to prevent standing water and blockages
Waste and supply stubs positioned accurately before screed is poured
Supply and waste points for sink, washing machine and refrigerator
Recorded pressure test on the supply network before walls are closed
Connecting the unit's supply line to the building tank and pump system
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We get a separate drawing for each trade before starting and mark crossing points on the slab. Plumbing usually runs in the first layer under concrete, and electrical and HVAC run above with safe clearance. Coordination with the contractor prevents collisions.
The minimum is 10 centimetres to prevent heat transfer from hot to cold lines. In very tight spaces we use thermally insulated pipes or install a metal shield between them. Testing reveals any heat loss before handover.
