Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
A roof tank in Nuzha needs a spot away from the air-conditioning units found on most roofs here. We measure distances, test load capacity, connect the overflow to its own line and push water from the tank to indoor pipework under steady pressure.
Nuzha has villas and mid-rise flats, every roof crowded with air units, old tanks and washing lines. Free space is tight and the new tank must sit in a safe corner away from central AC drains to dodge humid air. We test the concrete base by measuring slab thickness and ensure the overflow line has proper fall towards the roof drain collector.
Nuzha sits in Kuwait governorate, a residential zone where Nuzha Co-op serves residents near Al Nuzha Park.
We check concrete paint durability under the tank because humidity from roof AC units speeds erosion.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only if the AC is scheduled for relocation already. We usually prefer mounting the tank in the available corner and leave the AC in place to avoid opening new walls.
Usually no more than three metres with a continuous downward slope. If the distance is longer we use a larger diameter pipe to prevent blockage from algae or dust buildup.
