Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
A new underground tank in Nuzha requires careful planning because many plots here have unstable sandy layers. We dig cautiously and reinforce concrete walls strongly to withstand surrounding soil pressure. We cap the roof with insulated concrete and test the full system before handover.
Plots around جمعية النزهة التعاونية feature deep sandy soil requiring extra reinforcement in tank walls. We use tight timber formwork and pour concrete in layers, allowing proper curing time before stripping forms. Waterproofing is critical here because moisture and sand together cause slow seepage through fine cracks.
Nuzha sits in Kuwait governorate and is a relatively newer residential area bordered by Al Nuzha Park on one side.
We apply waterproof layers to interior surfaces and install perimeter drainage at the base to draw groundwater away.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, sand applies uneven pressure on walls. We use stronger concrete, add extra reinforcement, and install perimeter drainage protecting against groundwater pooling around the tank.
About three weeks from initial excavation to final testing, but proper concrete curing takes extra time in hot weather. We monitor temperatures and protect concrete from cracking through regular misting.