Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
Roof tank installation in Qibla starts by hoisting the tank to the roof via stairs or winch depending on size and access. We choose a position near the main water lines, set concrete supports, connect supply inlet overflow and draw-off, then test under pressure.
Modern Qibla residential towers have tight roof spaces shared with air-conditioning pipes and ductwork. We plan the horizontal pipe run to avoid crossing existing drainage lines and raise the supply point above other services. A tank set away from the main roof opening needs extra bracing of its base because load is spread over limited area.
Qibla sits on Kuwait Bay near Seif Palace, a commercial and high-rise residential zone where roof space is tight and tanks stand beside other equipment.
Every joint is held under steady water pressure for twenty minutes before the tank is opened for normal use.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we plan the new water lines carefully to avoid crossing cooling pipes and drains. We position the inlet high enough that future maintenance work on other equipment won't disturb it.
We measure the vertical and horizontal distance from the tank position to the main distribution riser, then calculate the pipe length needed. Long runs need intermediate brackets to prevent sagging under water load.
