Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Underground tank construction in Qibla starts by digging to the right depth away from the building foundation and existing pipes. We set a reinforced concrete shell, apply thick internal waterproofing and pressure-test the tank before connecting the water supply.
The high residential towers of Qibla need large underground tanks to collect night-time water when public pressure drops. We dig carefully beneath the narrow courtyard between towers because space is tight and drainage or electrical lines may be close by. After the concrete sets, we wrap the tank in heavy polyethylene sheet then carefully backfill the sides to avoid pressing the walls.
Qibla lies in Kuwait governorate, where dense residential towers meet the commercial zone near Seif Palace.
We fill-test the tank for twenty-four hours before handover because early leak detection avoids later excavation.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Depth depends on the foundation level of neighboring towers and existing drain lines. We conduct a site survey first, then choose a depth that keeps safe distance from all underground elements.
Yes, but it must sit far enough to avoid pressing the wall foundation during backfill. We leave at least a meter gap and compact the fill in thin layers gently.