Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
Roof tank installation in Rai starts by lifting the tank and steel frame to the roof with a crane, then bolting the base to concrete beams. We run supply and overflow lines, fit the ball valve and drain cock, then test the pressure when completely full.
Commercial and residential buildings in Rai stand eight to twelve stories high, and rooftops already carry air-coolers and old tanks. When replacing an old tank we inspect the copper runs that go from the roof down to the plant room in the basement for collapse. A new tank must sit at least one meter above roof level to give enough fall for distribution pipes to the floors.
Rai contains major shopping centers like The Avenues zone, a mixed commercial and residential district where buildings depend on high roof tanks.
Every soldered joint in the copper pipework is checked before tank fill because full pressure reveals any small leak.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We bolt the tank base with high-tensile fasteners to a level concrete pad, then pressure-test the sides before handover. Any crack or weld flaw shows up under full pressure.
A steady fall of no less than five millimetres per metre of pipe run. We measure the tank height and the plant room depth, then route the pipe to hold this fall along its whole length.
