Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
An underground tank in Rai for a store or shopping centre needs precise wide excavation beneath the foundation or side passage. We choose a location not blocking surface drainage or existing pipes, construct the tank with large capacity, thick walls and tight sealing, and test it under full pressure.
Rai contains shopping centres and major retail outlets with high water needs for restaurants, kitchens and facilities. The large underground tank must be built with thick walls to handle heavy loads from buildings above and vibration from vehicle and foot traffic. We place the tank away from service areas and main entrances and ensure access passage for tank and pump maintenance after completion.
Rai in Kuwait governorate is a dense commercial zone including The Avenues and IKEA where large underground tanks serve shops and facilities.
We test a large Rai tank at full capacity and check wall and floor pressure under heavy water load for twelve hours.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but requires strong engineering for walls and floor to handle continuous car weights. We increase concrete thickness, add internal reinforcement and carefully test the structure before opening the car park.
We leave a protected access port above the tank with a strong cover that does not hinder foot traffic. We schedule periodic service and cleaning without closing the centre, usually at night.
