Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation in Sabah Al-Ahmad City requires coordination with the city's planned infrastructure and unified building standards. We check the roof foundation and load capacity to match city specs. Then we fix the tank and integrate its pipes with the central water distribution system.
Buildings in Sabah Al-Ahmad City follow unified architectural standards, and roofs are already designed to carry set loads. We coordinate with the main contractor to ensure tank placement matches the original engineer plans. Water pipes in this planned city come via main headers under roads, and the fill line drops from a standard riser on the building face.
Sabah Al-Ahmad City is a planned coastal development in Ahmadi where unified standards and specs govern design.
We test the tank under 1.5 times normal operating pressure before delivery, per city standards.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Site changes need approval from the engineer and city. We check new roof load capacity, new pipe runs and overflow height. If the city approves, we proceed with the same materials and testing.
We install a temporary storage tank or run a line from the nearest underground header below the street. We coordinate with city municipality for the main fill line arrival schedule and support the tank on temporary foundations.
