Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
An underground tank in Sabah Al-Ahmad City is built within a planned urban scheme with clear property boundaries and fixed service routes. We avoid front setback and existing lines, choosing instead a rear or side yard spot. Excavation follows municipal code and work is documented in final drawings.
Sabah Al-Ahmad City is planned on a precise street grid with underground lines well documented. Residential plots are spacious with regular yards and fixed building setbacks. This lets us excavate the tank in a safe spot clear of all lines and foundations. We obtain the utility map from the municipality and conduct a site survey with precision tools before marking any dig points.
Sabah Al-Ahmad City is located in Ahmadi governorate, a modern real estate development with high building standards and fully organized utility services.
All underground lines in the city are precisely recorded in a geographic information system, so we obtain data before any excavation work.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we file an excavation request with the municipality's technical department including site and tank drawings. The permit is usually issued within a week and specifies conditions and allowed work period.
We consult the municipality about required distances from boundaries and building. Usually the tank is allowed in the rear yard at least one metre from property line and one metre from foundations per code.
