Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
Roof tank installation in Shamiya starts by checking the three-storey townhouse structure and flat roof that will carry the tank. We pick a spot close to the main supply line, connect inlet, overflow and vent, fill the tank and test pressure.
Most Shamiya buildings are residential blocks of three or four storeys with small shared roofs, so the tank must be sized to fit. We check the roof walls for cracks before positioning the tank, and overflow pipes run away from the building's main entrance. Where the roof floor is weak we build a metal load-spreading base instead of a heavy concrete pad.
Shamiya is a popular residential district near Kuwait City's Fifth Ring junction with closely-set buildings and limited roof space.
Tank size is scaled to the number of flats because shared roofs cannot support oversized tanks.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if water rights are shared across flats we install one tank with separate distribution points. Each flat gets its own meter or a division valve to control its share.
We select a smaller tank or split it into two or three running in parallel on the roof. If pressure is weak we install a booster pump on the ground floor to raise pressure throughout the day.
