Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Jahra
Roof tanks in Sulaibiya Agricultural serve farms scattered among homes and fields. We position the tank clear of irrigation pipe runs and fit fittings rated for high irrigation pressure, then check every line under working pressure.
Farms in Sulaibiya Agricultural have small fields and residential homes on a single roof. The tank collects treated drinking water but also feeds buried irrigation pipes to adjacent fields. We test line separation closely and ensure the house line never drops to take irrigation water, with a check valve at the split to prevent backflow. The roof height itself may be lower than an adjacent residential roof.
Sulaibiya Agricultural is west of Jahra, where family farms dot flat land with roof heights reaching three or four metres.
The check valve between drinking and irrigation lines is tested three times under high pressure to confirm complete closure with no backflow seepage.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We fit a high-grade check valve at the split from the tank to allow water flow to irrigation only. It is tested under full pressure and positioned for easy access to yearly maintenance.
Yes, we map buried pipe routes first, then place the tank clear of split points. This cuts the length of raised pipe runs and keeps maintenance easier later.