Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Jahra
Roof tank installation in Sulaibiya Industrial starts with raising the tank and securing it to a perfectly level concrete base. We run supply and overflow lines, pressure test at every point, and hand over only when all connections hold.
Large industrial buildings and warehouses in Sulaibiya need high-capacity roof tanks, and distribution pipes from the roof run down the exterior or interior walls of the structure. We check roof strength before lifting and choose a spot away from ventilation outlets and old pipework. Most warehouses have washrooms and standpipes in common areas, and the roof tank must feed every point with steady pressure all day.
Sulaibiya Industrial lies in Jahra governorate, a dense factory and warehouse zone where the roof tank is the main water source for multiple facilities.
The tank runs under full pressure for one hour before live water fills it, because weld leaks show only at real operating pressure.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We ask for building plans or climb to measure the slab and beam thickness ourselves. If load is near the limit, we spread weight across multiple foundations or suggest an alternative location.
Yes, they must slope steadily from tank to discharge point without water pooling in a dip. We plot the route during installation and test flow by filling the tank.