Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Hawalli
Water tank installation in Salam requires building committee approval before replacing or fitting a shared rooftop tank on a block dating to the nineteen-fifties or sixties around the Salam Co-op. One tank serving every flat means coordinating a temporary water cutoff that suits all residents.
Salam's older blocks typically rely on one shared rooftop tank feeding every flat in the building, and replacing or majorly servicing it requires cutting water to the whole block for a period, a decision affecting all residents rather than one flat. We coordinate suitable timing with the building committee, check the old main pipes connected to the tank before installation, and confirm the new tank's size accounts for the actual flat count rather than simply repeating the old tank's size without review.
Salam in Hawalli governorate is a district of mid-rise apartments built in the nineteen-fifties and sixties around the Salam Co-op, with shared rooftop tanks.
Replacing a shared rooftop tank in Salam's blocks requires cutting water to the entire building for a period, not just one flat.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Because the tank serves the whole building, and cutting water during the work affects every flat, so coordinating timing with the committee minimises disruption for everyone.
Not necessarily, since we review the current actual flat count, and the right size may be larger or smaller than the old tank, which may not have been sized accurately when first installed.
