Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Building an underground tank in Abdullah Al-Salem starts with site excavation and checking groundwater level and soil type. We pour reinforced concrete walls at proper thickness, apply multiple waterproof layers against seepage and mould, then fill-test the tank before connecting to the supply network.
Most Abdullah Al-Salem homes near the British Embassy area rely on underground tanks because mains pressure drops during peak hours. The buried tank needs deep excavation in sandy soil that may contain hard layers, and sometimes shallow groundwater requires a drain system around the tank. We size the tank depth to allow filling from a tanker lorry and prevent fracture under the compacted soil load above.
Abdullah Al-Salem lies in Kuwait governorate, a residential coastal suburb near the Gulf where most properties need an underground water tank.
We measure finished concrete wall thickness with a gauge after curing to ensure long-term protection against corrosion.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we excavate the tank pit below the groundwater table and install a gravel and pipe drainage system around the base. This prevents groundwater seepage and reduces lateral pressure on the tank walls.
Concrete needs three weeks of curing before first fill, and we soak the tank for an extra week before final connection. The delay lets the waterproof coating fully bond and the concrete reach full strength.