Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Underground tank construction in Daiya starts with lifting municipal water to roof height for your household supply. We dig to a fixed depth below foundation level, build the tank in reinforced concrete with complete waterproofing, then pressure-test before connecting to the pump line.
Daiya houses near the British School need robust tanks because municipal water pressure is uneven at peak hours. We choose dig locations away from load-bearing wall foundations and probe the sandy soil to find the safe digging depth. A tank built from reinforced concrete with cement-based waterproofing protects water from contamination and resists the constant hydrostatic pressure.
Daiya lies in Kuwait governorate, a residential area overlooking Daiya Park where municipal bylaws limit excavation depth for underground structures.
We install an inspection manhole in the tank roof because internal sediment cleaning is required every two years.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We usually dig 1.5 to 2 metres below foundation level, but Daiya's sandy soil may require adjustment. We test soil bearing strength and check groundwater levels before setting the final depth.
Yes, but we avoid locations near foundations and existing pipework. We map all underground lines before digging the trench to prevent damage to utilities.
