Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
Underground tank construction at Ahmadi Stables requires deep excavation and handling of coastal sandy soil. We first check groundwater levels, then size the tank depth and volume for stable demand. Walls are poured in salt-resistant concrete and sealed with waterproof coatings. Final connection and pressure testing ensure reliable storage year-round.
Stables need large tanks because water use is continuous for drinking, cleaning and arena maintenance. Sandy soil around the track drains quickly, so we build tank walls thick and foundations solid on compacted sand or rock. We load-test the tank roof before construction above it and leave safe access for routine inspection. Supply and return pipes are tested separately before final connection.
Ahmadi Stables lies in Ahmadi governorate, a unique site where design must account for salt spray and coastal ground conditions.
Before closing the excavation, the tank is filled with test water and monitored for 48 hours because sandy foundations settle gradually.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We apply silicon-treated cement sealant to all interior walls in full. The tank is then pressure-tested with fresh water to ensure no seepage at any joint.
We excavate to solid rock or firmly compacted sand, usually found at 4 to 6 metres deep. Soil bearing capacity is tested before final excavation with sample drilling.