Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Ahmadi
Roof tank installation at Ahmadi Stables starts with checking the roof structure and load capacity. We choose a spot near the main water intake point and secure the tank on a solid concrete base. Supply and waste pipes are run at the correct fall, then tested under full pressure before handover.
Equestrian facilities in Ahmadi need large roof tanks because the number of horses and staff requires reliable water supply throughout the year. The stable roofs are sturdy and spacious, but we ensure the tank does not block ventilation openings or discharge over nearby electrical pipework. We measure the distance from the inlet point and check the waste pipe fall to prevent water pooling on overfill.
Ahmadi sits in Ahmadi governorate and is known for its equestrian stables and horse racing track facilities.
After installation, we run the empty tank then fill it completely to test every supply and waste line under actual pressure.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but a longer supply pipe will need more support brackets and inspection points. The longer the run, the more pressure is lost and an additional pump may become necessary.
We watch the water level for one hour without any draw. Any drop points to a leak in the tank walls or joints, and we clean the area and retest.
