Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
Roof tank installation in Daiya starts with checking the roof structure and load capacity before choosing the position. We anchor the tank to a level concrete base, run inlet and outlet lines, then test under full pressure before handover.
Most Daiya villas near British School of Kuwait have flat, sturdy concrete roofs built in the 1980s. We inspect the roof first to check for leaks or cracks, because any weakness must be repaired before placing the tank. A heavy tank needs a carefully prepared base, and its overflow must drain toward the roof trap without pooling water.
Daiya is a quiet residential district in Kuwait governorate, where most homes are family villas with spacious roofs.
Every supply line is tested at 3 bar for 30 minutes because even a small joint leak affects water loss over time.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the roof first and calculate total load. If there is any doubt, we recommend extra reinforcement or placing the tank over defined load-bearing points.
We position the tank so its overflow pipe slopes steadily toward the roof trap. If the trap is far away, we run an additional drain line with proper fall.
