العربية Call now

Farwaniya

Underground tank construction in Khitan Al-Jadida

Underground tank construction in Khitan Al-Jadida starts with ground survey and marking supply and overflow points. We excavate to depth, cast reinforced concrete walls, seal the base with an impermeable layer and fill-test before connecting to the building.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Villas in Khitan Al-Jadida are mostly new-built and need underground tanks for water storage beneath front or rear courtyards. We choose a location clear of power and sewerage lines and ensure walls sit at least one meter from building foundations. A properly constructed tank withstands water pressure for years without leaks and stays maintainable because the top access opening gives full entry.

Khitan Al-Jadida sits in Farwaniya governorate, a residential investment zone where space allows separate underground tanks.

Each tank is filled to capacity and wall pressure is monitored for one hour before handover because any leak shows instantly under load.

What the job covers

Site and depth planning

Position and depth chosen to suit the transfer pump and surface loads

Walls and base construction

Base and walls built to carry soil pressure and full water load

Full waterproof lining

Internal and external coating layers that block water movement in both directions

Pipe entry points

Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks

Pump and float connection

Transfer pump and water-level float wired and adjusted for correct operation

Tightness test

Tank filled and water level watched to confirm zero leakage before backfilling

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Underground tank construction

Back to Underground tank construction

Other services in Khitan Al-Jadida

Common questions

Questions about Underground tank construction in Khitan Al-Jadida

Need someone now? The emergency line is open any hour.
+965 9668 4964

How far must the tank sit from the house foundations?

At least one meter on all sides. This distance protects the foundation from moisture and lets us work around the tank without placing load on nearby structure.

Is the tank tested before it gets buried under the ground?

Yes, we fill it with water and hold it full for at least one hour, inspecting every concrete joint and any potential crack before the roof is sealed.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp