Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Farwaniya
An underground tank in Omariya typically serves one family villa collecting waste from bathrooms, kitchen and garden. We excavate carefully beneath the footings, erect thick reinforced concrete walls, then fill and pressure-test before final backfill.
Omariya villas are closely spaced with tight grounds around each house, so we choose the tank location carefully to be remote from drinking wells and deep enough to receive waste from ground level. Excavating safely requires protecting adjacent building walls since machinery vibration can crack them. After casting we leave the tank open for inspection and cleaning before any final cover.
Omariya is in Farwaniya governorate, a residential area of detached villas where underground tanks are the standard in every property.
We inspect wall and base reinforcement immediately after pouring before concrete sets to catch any surface cracking.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If cast properly and covered with compacted sand, the garden grows normally above it. We leave a controlled access opening for periodic cleaning and maintenance.
Casting takes one day, initial cure three days before full water testing. After successful pressure testing it can be covered and backfilled in one day.