Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
Underground tank construction in Maqwa focuses on excavation in an industrial zone surrounded by oil wells and existing pipelines. We locate the site away from hazardous lines, build reinforced concrete walls, apply extra thermal insulation to the roof, fit safe connections and perform full tank seal testing.
Maqwa is an industrial zone near national oil company fields with administrative buildings, maintenance workshops and worker housing near Maqwa main office. Tank excavation here requires clearance from industrial safety and precise mapping of underground pipelines before work starts. We use metal detectors and sonic ground survey to ensure no oil or gas line is cut during digging.
Maqwa lies in Ahmadi governorate near oil fields, an industrial zone with limited utilities where facilities rely on underground tanks for water.
Before tank excavation we conduct sonic ground survey to map underground pipes because cutting an oil line halts production.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We request official maps of underground lines from the maintenance division. We use a hand-held metal detector and sonic scanner to locate every line before actual excavation begins.
Yes, we add extra thermal insulation to the roof to reduce water evaporation from industrial heat. A safety vent valve is fitted to the tank cover and every connection is tested under double pressure.
