Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Ahmadi
An underground tank at Mina Abdullah serves oil loading operations and temporary fresh water storage. We excavate near main pipeline routes while maintaining safe distances, then build strong walls and seal them with high-performance waterproofing.
Mina Abdullah terminal has multiple loading facilities, large surface storage tanks and a dense buried pipeline network. A new underground tank must sit away from existing pipes yet close enough for easy connection. We test the salty, wet soil's bearing capacity before excavating, as it affects foundation stability and coating durability.
Mina Abdullah lies in Ahmadi governorate on the eastern coast, where oil and gas export operations concentrate.
An additional waterproofing coat is applied to tanks here because the saline soil affects unprotected concrete.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, salty air and saline soil cause faster corrosion of steel and concrete. We use specially treated concrete and advanced protection coatings against salinity.
We locate pipelines first using ultrasonic detection, then excavate at least two meters away from any active line. Soil is tested regularly during digging.
