Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Underground tank construction in Nahda begins with a precise site survey checking for existing power, water and drain lines. We excavate to the specified depth based on local soil conditions, then build reinforced concrete walls to code. Final pressure testing ensures integrity of all joints and internal reinforcement.
Nahda homes near the Fourth Ring Road junction have high density of buried services and may have old pipes underground. Before digging we probe carefully to trace existing lines. The tank is positioned away from these lines and supported by special stabilizing mortar resisting soil slip around جمعية النهضة التعاونية.
Nahda lies in Kuwait governorate and is a residential area located a short distance from the Fourth Ring Road junction with major streets.
We conduct full water pressure testing on the completed tank at working pressure to confirm walls are free from fine cracks.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We stop immediately and trace the exact pipe route, then contact the utility operator. We may shift the tank location slightly or relocate the pipe with official approval before starting work.
Due to dense underground services we provide a comprehensive survey report before excavation and a documented pressure test certificate after construction. This protects your home and neighbours from future complications.
