Copper or steel pipe run
Correct diameter pipe sized to kitchen appliance load and inlet pressure.

Mubarak Al-Kabeer
Kitchen gas lines in Qosor require careful planning because meter inlets are often in a far corner away from the main kitchen. We run the pipe smoothly without sharp bends, test the pressure and sign off the inspection before connecting any appliance.
Qosor houses in the south tend to be larger than standard villas with separate kitchens and extra utility rooms, and gas meters may sit behind the villa or on a distant side wall. Running the line from there to the kitchen means examining how pipe crosses foundations and walls without sharp bends that restrict gas flow. Each crossing point needs protection and clear pipe routing with good-quality copper or stainless steel tubing.
Qosor sits in southern Mubarak Al-Kabeer governorate, where larger villas are spaced apart and meters sit far from main kitchens.
Every pressure test is recorded on paper because long runs need more thorough checks than short runs.
Correct diameter pipe sized to kitchen appliance load and inlet pressure.
Individual outlet with isolation valve for each hob, oven or fryer.
Pipe run inside protective conduit or channel with ventilation clearance observed.
Joints finished by brazing or press-fit method suited to the pipe material.
Nitrogen pumped to test pressure and held to confirm every joint is tight.
Inspection of an existing run and repair of any corroded section or weeping joint.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Length is not the issue as much as tubing quality, controlled bends and properly sited valves. We use thick copper piping, bend gradually and test every metre of the line to ensure even pressure.
Yes, a main valve at the meter and an individual shut-off at each appliance allows maintenance shutdown without closing the entire kitchen. Every valve is tested for smooth operation before handover.