Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Farwaniya
Building an underground tank in Sabah Al-Nasser requires knowledge of water and drainage network maps beneath the roads to avoid hitting main supply lines. We start with precise digging and build block walls at strong thickness with thick cement sealing. The tank is tested by full fill and pressure monitoring. We finish with secure connections for collection and drain pipes.
Sabah Al-Nasser is a relatively modern planned district with wide streets and public gardens, and homes have large roofs for water collection. Digging here sometimes encounters old foundation grids or pressurized supply pipes coming from the main station. We measure the location precisely on service maps and coordinate with Farwaniya municipality before digging. Near Sabah Al-Nasser Co-op, modern homes often have pre-installed underground tank foundations.
Sabah Al-Nasser sits in Farwaniya governorate near the Sixth Ring Road, a modern planned residential area.
Service network maps are checked with Farwaniya municipality before any digging to ensure the tank does not cross main water lines.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, main and pressurized water lines run under most major streets. So we advise against digging the tank directly under the front road, but in a side or back yard away from utility lines. We study the site with Farwaniya municipality first.
Yes, we file a permit request with Farwaniya municipality attached with site and tank drawings. The municipality checks that the tank does not cross utility networks or city planning. Typically approval takes two to three weeks before actual work starts.
