Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
An underground tank built in Shuwaikh Industrial serves a factory or warehouse needing stable water storage around the clock. We start by calculating required capacity and daily feed volume, excavate and build concrete walls of even thickness, then install pipes and outlets.
Large factories and warehouses in the Industrial Area need underground tanks holding tens of thousands of litres, often on plots with hard surfaces of asphalt or concrete paving. We remove the top layer, excavate deep, pour reinforced concrete and re-pave to the same standard. Access for cleaning requires a safe top opening with a metal handle and locking lid.
Shuwaikh Industrial Area in Kuwait Capital holds hundreds of factories and logistics warehouses that depend on reliable underground water tanks.
We perform a full fill and drain test on the tank before handover to confirm all valves and sensors work.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Depth depends on tank capacity, available space and groundwater. Usually one-and-a-half to four metres below ground. We survey the soil first, then choose the optimal depth.
Yes, but we remove the asphalt with a saw and dig the pit, then pour concrete. After completion we relay fresh asphalt over the roof with the access point slightly raised.
