Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Jahra
Water tank installation in Uyoun begins with checking the roof or ground location earmarked for the tank. We size the tank based on occupant numbers and daily demand. We set the tank on a level concrete foundation and run supply, overflow and vent pipes. Every connection is tested for leaks before handover.
Old Uyoun houses often relied on shallow wells and manual water collection, so modern roof tank installation transforms how the household consumes water. We measure tank height above the highest fixture in the house to ensure natural pressure. Supply from a well pump or the municipal line needs screening and a check valve to protect the well. Overflow and flushing require a separate drain to a ditch or soakpit.
Uyoun sits in Jahra governorate, a historic area near natural springs where reliance on groundwater remains strong.
Every pipe connection is pressure-tested immediately after installation because a small leak in the ground or roof may only show after weeks.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we fit a check valve on the well line and a pressure regulator on the municipal line to prevent cross-flow. The lines are separated by an air gap during filling.
Each metre of height gives roughly 0.1 bar pressure. Normal fixtures need 1 to 2 metres above the highest tap. We test the pressure with a gauge after fixing.