Walls and base coating
Full internal surface treated including the pit base

Ahmadi
Cesspit waterproofing in Wafra Agricultural begins with checking pit walls and base for cracks and seepage. We apply cement-based sealant across the entire interior surface, then water-test the base before replacing the cover.
Wafra Agricultural fields rely on deep cesspits below sandy soil level because drainage does not reach municipal networks. We measure pit depth from inside and inspect exposed cement walls that can be affected by climate dryness and seasonal movement. If we find hairline cracks we fill them with flexible mortar before sealing, and if cracks run deep we recommend wall reinforcement before waterproofing.
Wafra Agricultural is located in Ahmadi governorate, a zone of crop fields and agricultural compounds where sealed cesspits are essential to protect soil from sewage contamination.
After sealing, we camera-inspect inside the pit to verify complete coverage before closing.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The sealant stops seepage through walls and base but does not block gases rising from inside the pit. To stop odour completely you need a vent pipe in the inlet line before the cesspit.
Cement sealant needs seven to ten days to fully cure in Wafra's dry climate. On very hot days we may spray the surface during early days to prevent rapid cracking.
