Site level survey
Ground elevation readings confirm the natural direction water will travel

Ahmadi
Storm drain design in Wafra Agricultural starts with precise reading of ground fall and buildings scattered across the farms. We trace drainage lines from the site high points to collection sumps and map each pipe and inspection chamber. We test the system with water and hand over final drawings ready for construction.
Wafra Agricultural has many agricultural buildings with wide roofs and open yards, and each roof and courtyard must drain away from building foundations and internal roads. We design surface channels or buried pipes based on elevation and distance, and fit inspection chambers at regular intervals for easy clearing. The sandy soil near Wafra Co-op absorbs water quickly, but we ensure any temporary pooling does not affect built areas.
Wafra Agricultural lies in Ahmadi governorate, a region combining farming and rural facilities that need effective protection from seasonal rainwater.
Before handover we clear all sumps and run a full flow test to confirm no blockages before use.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a level at each roof corner to find the natural water direction, then design drop pipes that collect water from the edges and direct it to main underground drain lines.
Sandy soil absorbs water quickly, but we still direct all roof and yard runoff away from buildings to prepare for heavy rain and prevent any temporary flooding near foundations.
