Site level survey
Ground elevation readings confirm the natural direction water will travel

Jahra
Storm drain design in Sulaibiya Industrial must handle wide roof areas and large paved surfaces. We read the factory and yard levels and draw pipe routes, trenches and dry wells. The design accounts for high pressure from large water volumes and rapid drainage. Drawings show large pipe diameters, depths and locations on the site plan.
Sulaibiya Industrial buildings have wide metal roofs and flat paved yards where rain collects quickly. Roof drain pipes need large diameters because the volume is massive within minutes, and yard base lines need steady fall over long distances. We measure total area, levels at building corners and ground, then calculate needed dry wells. Dual lines and inspection points are essential because one blockage could flood the entire yard.
Sulaibiya Industrial in Jahra governorate houses factories and warehouses with large roofs and wide open areas needing precisely designed drainage networks.
We test the network by pumping water from an overhead tank because actual rainfall may come faster than the expected drainage capacity.
Ground elevation readings confirm the natural direction water will travel
Expected flow volume determines the correct pipe diameter for each run
Gullies are positioned so no low point is left without an outlet
Chambers placed at every direction change to allow future maintenance
Adequate slope prevents sand settlement and keeps flow gravity-driven
Final discharge point set away from foundations, fencing and neighbouring plots
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we usually place two or three wells at building corners or yard centre to split the load. The number depends on total area and the main pipe diameter available.
We draw pipes with continuous fall toward dry wells and add inspection points at each corner for sediment clearing. If dry wells prove insufficient we suggest a horizontal collection tank that drains slowly.