Pipe routing
Mapping every copper run before walls are plastered over

Farwaniya
Gas network installation in Firdous runs from the main meter through copper pipes to each cooktop and heater before plastering and painting. We air-pressure-test the entire network, then run gas to verify safety at every connection.
Firdous homes are typically multi-storey villas needing gas outlets in kitchens, living rooms and bedrooms on each floor. We run pipes inside external walls with standard angles and consistent bends for later repair access. We secure joints at bends and every two metres, and pressure-test each floor before closing walls.
Firdous sits in Farwaniya governorate near Sixth Ring Road, a residential area of modern villas.
Each vertical distribution pipe is held at 10 bar pressure for five minutes before moving to the next floor.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Pipes must sit a few centimetres below the wall surface, away from electrical wiring. We maintain safe clearance from power cables and document their exact location on the handover drawing.
A new outlet can branch from the main pipe if pressure and load capacity allow. We measure pressure drop over the new run and select the right pipe diameter before installation.