Pipe routing
Mapping every copper run before walls are plastered over

Farwaniya
Central gas network installation in Khitan Al-Jadida begins at the main meter near the entrance. We route supply branches to every gas outlet in the kitchen, heating and air units before plastering starts. Each joint is tested under pressure then with soapy water to confirm no leaks. Handover includes a full pressure test certificate.
Most modern villas and apartments in Khitan Al-Jadida have at least three gas points: a cooker in the kitchen, a heater in the lounge and central heating on the roof. The distances between these outlets are long, meaning the distribution network must run through multiple walls and corridors. We use standard copper piping and bend at corners instead of using fittings to reduce potential failure points.
Khitan Al-Jadida lies in Farwaniya governorate and is a modern residential area with apartment buildings and villas that use centralised heating systems.
All tests are done before the walls close because the pipes cannot be reached once plaster is applied.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We fill all lines with nitrogen at a set pressure and monitor them for hours. Then we apply soapy solution to every joint and connection to spot any gas bubbles. This dual test is essential before we sign off on handover.
Yes, but it requires opening the wall or floor at the connection point to the main network. The new line needs a separate pressure test before use and handover comes with a fresh test document.