Pipe routing
Mapping every copper run before walls are plastered over

Mubarak Al-Kabeer
Central gas network installation in Qosor requires running copper pipes from the meter at the southern entrance to the main kitchen and guest bathroom. We test each branch under steady pressure and confirm no joint leaks before walls and tiles are sealed.
Qosor houses in the south are typically large villas with deep foundations and spacious kitchens beside a service room. This layout means the main pipe can take a straight run under the concrete slab from the meter near Qosor's narrow public gardens to the kitchen. We inspect the sub-base before pouring to ensure no voids under pipes, and test every metre with soapy water before concrete cover.
Qosor sits south of Mubarak Al-Kabeer governorate, a zone of detached villas where the main meter is usually very close to the kitchen.
Every gas branch is bedded in wet sand under the foundation before concrete pours to prevent pipe friction against stone.
Mapping every copper run before walls are plastered over
Branching the network to each appliance position per plan
Fitting an isolation valve at every outlet for future servicing
Dry nitrogen charge and pressure hold test before handover
Core drilling wall openings and securing pipes with correct clips
Recording final pipe routes for future maintenance reference
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we bed the pipe in a layer of wet sand before concrete pours to reduce pipe movement. We run full pressure test before the pour.
We run the pipe from the meter under the slab then it rises through an outer wall or internal passage to reach the upper kitchen. We carefully inspect the rise point to secure the pipe with metal clips.
