Central gas first-fix
Main gas network laid and pressure-tested before walls are plastered.

Jahra
Gas line installation in Sulaibiya Industrial must be planned for large areas and heavy loads. We run large-diameter pipes from massive storage tanks to distribution stations and pressure-test to strict safety standards before startup.
Sulaibiya Industrial factories and warehouses have very high roofs and wide passages between buildings. Pipes running over corridors and heavy machinery need robust metal supports and visible warning markers. Each main line branches at isolated distribution panels with valves, gauges and safety devices, and routine checks cover leaks, pressure and ventilation.
Sulaibiya Industrial zone in Jahra governorate houses hundreds of small and medium factories consuming large quantities of natural gas.
Every industrial gas line is tested at full flow rate and high pressure weekly to detect any performance drop.
Main gas network laid and pressure-tested before walls are plastered.
Residential kitchen gas points run to correct sizing and outlet count.
Commercial kitchen gas networks sized for high demand with isolation at each appliance.
Leak located with detection instruments before any wall or floor is opened.
Ball valves fitted at the main inlet and at every branch point.
Periodic check of all valves, joints and fittings across the gas network.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate peak load from all equipment combined then choose diameter ensuring pressure drop below 3 bar. Wider pipes provide buffer for future expansion.
Industrial meters measure much larger volumes and carry built-in safety valves and pressure alarms. They are mounted in an isolated panel with gas dryer to protect pipes from moisture.
