Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Jahra
Tank installation in Sulaibiya Industrial requires calculating the factory or workshop daily consumption. We select a very large underground tank, fit a heavy-duty pressure pump and run pipes across the area to reach each building. Full-load testing happens before operational handover.
Factories and workshops across Sulaibiya Industrial need massive tanks because production processes, washdowns and cooling systems consume huge volumes daily. We excavate the site and install a steel or concrete tank with an access shaft for sediment removal and routine maintenance. Large-diameter pipes run under paved roads to feed each building at equal pressure.
Sulaibiya Industrial Area in Jahra governorate hosts factories and small refineries that depend on steady and reliable water supply.
We measure the factory actual consumption rate over one week and size the tank with a safety margin for peak-demand hours.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on factory size and production stages. We calculate peak consumption including high-demand periods and scheduled maintenance stops.
We install a pressure regulator and check valve to prevent pressure drop during outages. An auxiliary roof tank or emergency reserve tank can be fitted for temporary supply continuity.
