Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Capital
Drain-line layout in Dasman starts before the concrete slab goes down, while the foundation is still open. We run waste lines from every wet area, position floor traps where they belong and test every pipe before the slab seals over.
Seafront buildings in Dasman need fast drainage because foundations sit close to groundwater level. We calculate waste falls carefully from every bathroom to the main collection pit so water never sits in a level pipe. We set floor traps at the right depth and test all falls with a straight edge before concrete covers anything.
Dasman sits on Arabian Gulf Street in Kuwait City, a high-rise district where horizontal waste distribution must account for tight falls and drainage pressure from upper floors.
Every two-meter section of waste line is checked to maintain a slope of one in one hundred, preventing stoppages or steep runs.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We place a floor trap directly under the sink outlet and run the line at steady slope to the main pit. Every fall is measured with a straight edge and level before concrete is poured.
Yes, we run vent pipes from bathroom and kitchen drains up through the roof before walls close. Venting prevents pressure vacuum that would slow drainage and trap odours.