Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Dasman starts by running hot and cold supply and waste before walls and ceilings close. We plan pipe routes from the roof tank, the AC condenser point and the main drain collector. Every supply and waste point is pressure-tested before finishing works begin.
Most villas and residential apartments in Dasman were built with central AC systems and private roof tanks, which affects where hot and cold lines can run. We check tank height and distance from the bathroom to calculate sufficient fall for waste without extra floor breaking. If the bathroom is on the first floor far from the tank, a booster pump or pressure regulator ensures even flow.
Dasman sits on the Arabian Gulf seafront in Kuwait governorate, an upmarket residential area where most homes have roof tanks and modern plumbing systems already in place.
Cold water is run through the supply line after leaving the tank to check for debris before the heater connection.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We trace the waste route from the bathroom and verify a steady fall of one in fifty toward the main stack. If the route is long or curved, we add an intermediate trap with an inspection cover.
We run an insulated cold line so heat loss in summer heat is minimal, and add a pressure regulator before the heater inlet to protect pipes from strain.
